Diff for "Projects/ParallelTesting"

Not logged in - Log In / Register

Differences between revisions 7 and 8
Revision 7 as of 2012-03-22 16:05:40
Size: 1766
Editor: flacoste
Comment: Updates based on last checkpoint
Revision 8 as of 2012-04-12 00:47:39
Size: 1766
Editor: flacoste
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
'''Current week:''' 12<<BR>>
'''Next [[PolicyandProcess/FeatureDevelopmentCheckpoint|checkpoint]]:''' 2012-04-04
'''Current week:''' 14<<BR>>
'''Next [[PolicyandProcess/FeatureDevelopmentCheckpoint|checkpoint]]:''' 2012-04-18

Parallel Testing

See also paralleltest bug tag

Squad started: 2012-01-02
Current week: 14
Next checkpoint: 2012-04-18

Scope

See the LEP

Out of scope

As documented in the LEP.

Blockers

None

Deliverables

Whatever you need to keep track of deliverables. An example, including some common ones is included below. Deliverables often correspond to a group of user stories or a single user story

Item

Owner

Expected date

Status

Signed off LEPs

lifeless

2012-01-05

COMPLETED

Secure test hardware

flacoste

2012-02-28

COMPLETED

Get repeatable deployment story

yellow

2012-03-07

COMPLETED

Determine scaling behavior

yellow

2012-03-27 (2012-03-07)

IN-PROGRESS

Root out instability

yellow

2012-03-21

IN-PROGRESS

Secure production hardware

flacoste

2012-04-04 (2012-03-07)

Feature documentation

gary

Blog post

gary

Notes

Checkpoints Notes

Action items for next checkpoint

  • [yellow] Bug fixes for test failures discovered in parallel test runs.
  • [yellow] Scaling assessment based on experimental results
  • [yellow] Get data center box running tests, and have a single comparison run with ec2.

Projects/ParallelTesting (last edited 2012-04-12 00:47:39 by flacoste)