Diff for "PolicyAndProcess/Downtime"

Not logged in - Log In / Register

Differences between revisions 46 and 47
Revision 46 as of 2010-08-02 11:43:12
Size: 13982
Comment:
Revision 47 as of 2010-08-04 14:58:30
Size: 13764
Editor: flacoste
Comment: ISD contacts us when they need to upgrade ShipIt
Deletions are marked like this. Additions are marked like this.
Line 62: Line 62:

  .☐ Send out an email to Stuart Metcalf from Canonical ISD about the upcoming roll-out to ask about any changes that need to be rolled-out for shipit. (Launchpad roll-outs imply a roll-out of the ShipIt code).

  • Process Name: Release Manager Rotation Process

  • Process Owner: Francis Lacoste

  • Parent Process/Activity: None

  • Supported Policy: None

Process Overview

Each cycle a different engineer takes the role of release manager. The release manager coordinates with the release team and all team leads to ensure that the tree is ready for the roll-out and that all critical bugs are in or worked-around.

Back-up release managers are the two RMs from the previous two cycles.

One option that has worked very well is to share the release-manager role across timezones, handing over the current status and tasks to the backup in the next timezone at the end of your day. It's a great opportunity to work together as a team.

Release Manager inputs

Activities

When you start

  • Negotiate and confirm the dates and times for the main release window and a backup release window with the Launchpad Project Lead, then with the LOSAs and OEM, and finally with the stakeholder's list (Platform, etc.). Refer to the Launchpad Release Calendar for the pre-scheduled dates and times (we has a process in place to ensure our release calendar does not conflict with Ubuntu; conflicts normally do not happen). The goal is to confirm that the scheduled downtime does not interrupt other teams at critical times, to ensure that the release window does not place undue stress or risk upon our own operations team, and renegotiate the dates and times if necessary.

    • Check the stakeholders list archives for the mails I sent out if you are looking for a template. -- mars 2010-07-29 14:37:13

    • Consider when critical people have scheduled holidays and vacation around the release date. You can run a release without critical people like DB reviewers or the Project Lead, but it increases the stress and risk when something goes wrong. -- mars 2010-07-29 14:37:13

    • We consider the backup release window now because getting feedback from all the stakeholders can take a few days. Presumably you want to try a second rollout as soon as possible after the first (ask the LOSAs about what a reasonable backup window would be). -- mars 2010-07-29 14:52:37

  • Ask Stuart M. on the ISD team if they need to roll out an update to ShipIt with this release. ShipIt releases are bundled with Launchpad releases.

End of Week 2

  • ☐ Notify the canonical-launchpad list of the expected date and time for PQM closure. This should ideally happen at least 1 week before PQM closes; at the latest it should happen at the start of Week 3.

Week 3 (the one before the roll-out)

Preparation is required. Many items can be considered critical.

Start of Week 3

  • ☐ Ensure that staging is up-to-date and had a DB restore so that it can be used for non-edge QA.

  • ☐ The down-time estimate should be based on the last staging DB restore. We should be overly conservative in the read-only announcement. Recently, we always encountered DB locking issues during the roll-out which increased the read-only window. Until we are able to have stable DB upgrades and determine a reliable fudge factor between time on staging and production, we should plan for the worst and come back earlier.
  • ☐ Follow the needs testing bugs and encourage engineers to QA before PQM closes.

During Week 3

  • ☐ Ensure that Matt Revell has a downtime announcement email ready for lp-announce.

End of Week 3

On the day the PQM closes.

  • ☐ Also go through all the 'unusual rollout requirements' and clean them up from LaunchpadProductionStatus page

  • ☐ You might want to request that pqm-blockers (such as cherry-picks) are not processed on the day that PQM is closing.
  • ☐ Make sure all the cowboys listed on LaunchpadProductionStatus are either already landed or listed among CurrentRolloutBlockers

  • ☐ Offer to review anything may need a release critical. Provide your RC to any work that may miss the PQM close time (EC2 is unpredictable). Providing RCs before the close of PQM allows engineers to work with some certainty that there work is required.

  • ☐ Ask Matthew to update db-devel with the Recent Launchpad blog posts.
  • ☐ Ask the LOSAs to switch PQM to release-critical around 22:00 UTC (Friday or Thursday). Allow landing to devel.
  • ☐ Update the #launchpad-dev topic to state we are in 'Release Critical' and to list the release manager.

  • ☐ Be prepared to make test fixes over the weekend to ensure the last branches are complete, or back them out so that staging is ready for testing Monday

Release Week

Start of Week 4

  • ☐ At the beginning of week 4, schedule a call with the Foundations team lead (and other leads if known to be pertinent) to determine what system changes might need comprehensive QA. If these exist, consider these thoughts.
    • Any related problem encountered should be treated as a red flag, forcing more thorough QA.
    • Foundations lead should report on reviewing logs on edge, such as of cronscript output.
  • ☐ Look at the staging DB restore time for the week-end and determine if any changes to the announced down-time should be made.
  • ☐ Determine the schedule and deadlines. Send an email to launchpad-dev with all of the deadlines, similar to this example email. Place the deadlines on the team calendar.

  • ☐ Maintain the list of the Current roll-out blockers

During Week 4

  • ☐ The release manager should poll the team leads and QA engineers continuously to ensure that the list of release blockers is up-to-date. (We need to explore a work-around to retire this wiki page and do the management in Launchpad.)
    • All bugs that are likely to cause lots of OOPSes, time-outs or prevent several users from working are good CRB candidates.
    • It's a good idea to subscribe yourself to the page. (Currently broken.)
  • ☐ Make sure that developers are assigned to all problems we want to fix.
  • ☐ Review release-critical merge proposals. The policy should be:
    • All RC candidates go through the normal review process.
    • After code and UI review the MP is left in 'Needs Review' state.
    • A new review of type 'release-critical' is added to the MP and assigned to the release manager.
    • If the MP is approved for 'release-critical', the review is marked 'Approve' and the state of the MP is set to 'Approved'.
  • ☐ Consider closing devel for RC landings (Tuesday is usually the latest devel can be open)

On the day before the roll-out

  • ☐ Ensure that PQM is closed to devel, RC landing go to db-devel.
  • ☐ Check that the LOSA do a staged deployment of the code. We are looking for any hidden build problems and to determine the amount of time this step will take.
  • ☐ Ensure that any embargoed external resources (e.g. blog entries) are live and accessible through the links provided. Ensure that a blog editor (Matthew Revell or delegate) is available at the time of the roll-out.

On the day of the roll-out

  • ☐ Chase up Current Rollout Blockers and any other pending release-critical fixes.

  • ☐ With PQM remaining open, have the LOSAs stop buildbot and set it do manual runs. This step just keeps the buildmaster process tree tidy when the codehost servers are restarted.
  • ☐ Remind people that all changes need to be in buildbot for 9 hours before the roll-out time. The LOSAs require two hours of pre-release preparation and we need to allow for two complete buildbot cycles. (9 = 2 + 2 * 3.5)

  • ☐ In the case of failures, it's best to roll-out the last-known-good-build rather than delaying the release. The cut-off point to decide which revision to roll out is 2 hours before the scheduled release.

  • ☐ Re-announce downtime so it serves as a reminder on launchpadstatus account at least 4h before the actual rollout.

  • ☐ Check that source code dependencies revision numbers are correct (compare them with what is listed in utilities/sourcedeps.conf) "bzr branch lp:~launchpad-pqm/lp-production-configs/trunk" then look at config-manager/production-{devel,stable}

    • This step appears to be obsolete - the lp-production-configs have not changed for six months! -- mars 2010-07-06 21:51:47

  • ☐ Start a new RolloutReport to document any issues that will be encountered during the roll-out.

During the roll-out

  • ☐ If some unexpected problems are encountered during the roll-out and these put the roll-out schedule off-track by more than 30 minutes, the decision to abort the roll-out should be taken. In that case:
  • ☐ Identify the source of the problem and come up with a best estimate on how soon it can be fixed.
  • ☐ Determine when the next attempt should be undertaken and make sure it is announced. Give at least 12 hours of fore-notice.

After the roll-out

  • ☐ Immediately after the roll-out, examine the site for problems. For example, ensure CSS loads properly, all external links on the front page are reachable, etc.
  • ☐ Announce on launchpadstatus that the release is done.

  • ☐ Announce any post-roll out issues on lauchpadstatus as they are discovered. Add them to the incident report. (Following the Launchpad/PolicyandProcess/Announcements/IncidentProcess, where the release manager acts as the communication liaison.)

  • ☐ With the QA engineers, review the OOPS reports. All common OOPSes are candidates for more release-critical fixes and scheduling another roll-out.
  • ☐ Prepare and schedule any necessary re-roll.
  • ☐ When a re-roll is needed, same activities than in the pre-roll out case.
  • ☐ Complete the incident report and ask any engineers that participated in fixing the issues in doing root-cause analysis.
  • ☐ The release-manager needs to select the next release manager.

Re-opening PQM

Once the roll out is complete and any critical issues have been dealt with, it's time to re-open PQM. Before doing that, though, we need to merge db-devel back into devel.

Release critical policy

  • To apply for a release-critical approval, you must have a reviewed merge proposal on Launchpad. The engineer adds a review of type

    release-critical to the merge proposal and ensures it is in the 'Needs Review' state.

  • Good candidates for release-critical approval are issues found during QA that are bound to create OOPSes and time outs or otherwise significantly inconvenience our end-users.
  • Apart from special exceptions discussed with the project lead, only bug fixes should be granted release-critical approval.
  • If there is no way for the developer to QA his change on staging through the normal update procedure before the roll-out, it's recommended to request a cowboy of the branch on staging to QA it before approval.

Database Patches

  • Release-critical branches containing database patches should only be accepted if they don't impact the estimated roll-out time.
  • One the day of the roll-out, only database patches that would be critical to prevent data corruption should be accepted.
  • For the second re-roll, again only DB patches critical to data safety should be considered as it impacts our ability to update without down-time.

Scheduling

  • Engineers apply in advance for one cycle.
  • They are selected by the previous release manager. Once selected, their name

    is put on the Launchpad Production Status page.

  • The actual roll-out time is determined by the release-manager's location:
    • Location

      Roll out time

      Americas

      23:00UTC

      Europe

      10:00UTC

      Asia/Pacific

      00:00UTC

  • No engineer should apply for the role more than twice a year.

References

PolicyAndProcess/Downtime (last edited 2011-06-06 22:02:02 by flacoste)