Diff for "Projects/ParallelTesting"

Not logged in - Log In / Register

Differences between revisions 4 and 5
Revision 4 as of 2012-02-09 19:54:04
Size: 1631
Editor: flacoste
Comment:
Revision 5 as of 2012-02-22 20:45:16
Size: 1728
Editor: flacoste
Comment: Update based on Feb 22 checkpoint
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
|| Secure test hardware || flacoste || 2012-01-20 || IN-PROGRESS ||
|| Get repeatable deployment story || yellow || 2012-02-22 || IN-PROGRESS ||
|| Determine scaling behavior || yellow || 2012-02-22 || ||
|| Root out instability || yellow || 2012-03-07 || ||
|| Secure production hardware || flacoste || 2012-02-22 || ||
|| Secure test hardware || flacoste || 2012-02-28 || IN-PROGRESS ||
|| Get repeatable deployment story || yellow || 2012-03-07 || IN-PROGRESS ||
|| Determine scaling behavior || yellow || 2012-03-07 || ||
|| Root out instability || yellow || 2012-03-21 || ||
|| Secure production hardware || flacoste || 2012-03-07 || ||
Line 46: Line 46:
 * [yellow] Charm done done (in official charm repo, demoable with LP)
 * [yellow] performance testing started with preliminary results
 * [yellow] buildbot charms in the official repo
 * [yellow] Have the LP build steps tested and working within the buildbot environment
 * [yellow] Scaling assessment based on experimental results
 * [yellow] Have a deployment plan

Parallel Testing

See also paralleltest bug tag

Squad started: 2012-01-02
Current week: 6
Next checkpoint: 2012-02-22

Scope

See the LEP

Out of scope

As documented in the LEP.

Blockers

None

Deliverables

Whatever you need to keep track of deliverables. An example, including some common ones is included below. Deliverables often correspond to a group of user stories or a single user story

Item

Owner

Expected date

Status

Signed off LEPs

lifeless

2012-01-05

COMPLETED

Secure test hardware

flacoste

2012-02-28

IN-PROGRESS

Get repeatable deployment story

yellow

2012-03-07

IN-PROGRESS

Determine scaling behavior

yellow

2012-03-07

Root out instability

yellow

2012-03-21

Secure production hardware

flacoste

2012-03-07

Feature documentation

gary

Blog post

gary

Notes

Checkpoints Notes

Action items for next checkpoint

  • [yellow] buildbot charms in the official repo
  • [yellow] Have the LP build steps tested and working within the buildbot environment
  • [yellow] Scaling assessment based on experimental results
  • [yellow] Have a deployment plan

Projects/ParallelTesting (last edited 2012-04-12 00:47:39 by flacoste)